| Activities implemented for October 2007 |
Просмотров: 511
Дата
публикации: 18-05-2010, 22:24 |
Project: MR533/TJ000201/GLM
The technical tasks: Normalization of hydro geological mode of the ecological system of the Tigrovaja Balka with the objective of achieving eco-system development.
I. The building of the floodgate dam on the channel from the Halkakul channel lake - Dedovo to Allakuli Lake.
1. The transportation of a bulldozer on a trailer from the central country estate of the national reserve to cordon of "Royal woodland”. The distance of transportation is 50 km. Duration - 1day.
2. The moving with a bulldozer from cordon of the "Royal woodland” to the place of work. The distance is 5 km. The duration of the work brigade is for 1 day.
3. The work on stocking up local soil for blocking up the channels. The volume of the soil is 200 m3. The duration of the time of the brigade is for 2 days.
4. The work on installing the dam on the channel, trampling. The expenses of brigade time are 2 days.
5. The transportation of the brigade to place of the work and back (80 km) - 10 journeys. |
|
|